Energy management
CONFIGURATION OF PROBES FOR FANCOIL
99 ZONE CENTRAL UNIT CONFIGURATION
The 99 zone control unit item 3550
does not need physical congurators
but, to end the system conguration
operations, interact with the
“Congure zones” menu.
HEATING AND COOLING WITH
CLIMAVENETA FANCOIL
CLIMAVENETA
CHILLER
CLIMAVENETA CHILLER
Gateway
Gateway
Zone 1 Gateway
[ZA] [ZB] [N] [TYPE]
0 1 1 0
Zone 3 Gateway
[ZA] [ZB] [N] [TYPE]
0 3 1 0
Zone 2 Gateway
[ZA] [ZB] [N] [TYPE]
0 2 1 0
Zone 2 Gateway
[ZA] [ZB] [N] [TYPE]
0 4 1 0
Wiring diagram and conguration
of the gateway which controls the
As an alternative the TiThermo
application can be used. For these
operations refer to the manual
supplied with the products.
Zone 1 probe
[ZA] [ZB] [SLA]
0 1 -
Zone 2 probe
[ZA] [ZB] [SLA]
0 2 -
Zone 3 probe
[ZA] [ZB] [SLA]
0 3 -
Zone 4 probe
[ZA] [ZB] [SLA]
0 4 -
Electric diagram and configuration
of the GATEWAY installed inside the
Climaveneta fan-coil for the heating-
cooling of zone 2.
In order to control the fan-coils of
all other zones, perform the same
type of connection, ensuring correct
configuration of the actuator for
the specific zone, as shown in the
configuration tables.
Gateway CHiller
[ZA] [ZB] [N] [TYPE]
0 0 1 1
chiller. With one chiller, a system
can be slaved and operate both as
a heating system and as a cooling
system. The Gateway is connected
to the CLIMAVENETA chiller through
the collector found at the top on the
front, and to the BUS through the
draw-out connection terminal.